Rehabilitation of the Cable-Stayed Bridge on the Arade River

  • Location: Portimão / Algarve / Portugal
  • Solution: Bridges, Asset Management
  • Type: Road bridges, Rehabilitation
  • Promoter: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Client: ALGARVE LITORAL
  • Scope: Rehabilitation Project, Inspection, Geotechnical Studies, Drainage, Hydrological and Materials Testing
  • Project: 2012
  • Construction: 2020
  • Contractor: CONDURIL ENGENHARIA S.A.
  • Dimension: 470m long, 256m max span
  • See on Google Maps

Rehabilitation of the Cable-Stayed Bridge on the Arade River

  • Location: Portimão / Algarve / Portugal
  • Solution: Bridges, Asset Management
  • Type: Road bridges, Rehabilitation
  • Promoter: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Client: ALGARVE LITORAL
  • Scope: Rehabilitation Project, Inspection, Geotechnical Studies, Drainage, Hydrological and Materials Testing
  • Project: 2012
  • Construction: 2020
  • Contractor: CONDURIL ENGENHARIA S.A.
  • Dimension: 470m long, 256m max span
  • Ver no Google Maps

The Bridge on the River Arade is a cable-stayed bridge with three spans. The central span has 256m and the two extremes 107m.

The bridge is in a maritime environment, exposed to chemicals chlorides, high aggression, which led to accelerated degradation of the structure. In general the bridge presented numerous cases of reinforcement corrosion and surface spalling of the concrete. The stay-cable had several strands with damaged ducts. The longer cables had obvious problems of vibration.

The design developed by Betar referred to the rehabilitation of the bridge, including the stay-cable system, following detailed inspection.

The rehabilitation works consisted mainly in repairing concrete under the EN1504 standard. Also, damaged strands were replaced and a new duct was placed, as well as vibration dampers in the longer cables.

Other projects

New Railway Bridge over Shire River

New Railway Bridge over Shire River

See more
Replacement of the Matola River Bridge at pk26+900 of the Ressano Garcia Line

Replacement of the Matola River Bridge at pk26+900 of the Ressano Garcia Line

See more
Caldo river’s Bridge over Caniçada artificial lake

Caldo river’s Bridge over Caniçada artificial lake

See more
New Railway Bridge over Secongene River at k61+900 of the Ressano Garcia Line

New Railway Bridge over Secongene River at k61+900 of the Ressano Garcia Line

See more
Cadal Channal’s Bridge in Soyo, Angola

Cadal Channal’s Bridge in Soyo, Angola

See more
Pedestrian Bridge over Sizandro River in Torres Vedras

Pedestrian Bridge over Sizandro River in Torres Vedras

See more
Top

We use cookies to improve your browsing experience. By continuing to access this website you are agreeing to their use. For more information see our cookie policy.

Portugal 2020 / Compete 2020 / União Europeia - Fundo Europeu do Desenvolvimento Regional