New Railway Bridge at km 41+600 of the Ressano Garcia Line
- Location: Mozambique
- Solution: Bridges
- Type: Railway bridges
- Client: CFM – Portos e Caminhos de Ferro de Moçambique
- Scope: Preliminary Design and Detailed Design of the New Bridge; Preliminary Design and Detailed Design of the Railway Diversion; Topographic Surveying; Geotechnical Investigation; Construction Supervision and Technical Assistance During Construction
- Project: 2024
- Construction: 2025-2026
- Contractor: Teixeira e Duarte Lda
- Dimension: 25m long
New Railway Bridge at km 41+600 of the Ressano Garcia Line
- Location: Mozambique
- Solution: Bridges
- Type: Railway bridges
- Client: CFM – Portos e Caminhos de Ferro de Moçambique
- Scope: Preliminary Design and Detailed Design of the New Bridge; Preliminary Design and Detailed Design of the Railway Diversion; Topographic Surveying; Geotechnical Investigation; Construction Supervision and Technical Assistance During Construction
- Project: 2024
- Construction: 2025-2026
- Contractor: Teixeira e Duarte Lda
- Dimension: 25m long
The new bridge accommodates a ballasted double-track railway and features a continuous deck with a total length of 25 m (reinforced concrete), comprising two clear spans of 11.5 m each (23 m in total).
The bridge deck consists of two independent continuous reinforced concrete slabs, each with a variable thickness ranging from 0.70 m to 0.90 m and a width of 5.20 m (5.40 m including parapets and cornices), resulting in an overall bridge width of 11.40 m.
At the central support axis, the deck is supported by two piers (one for each deck slab). The piers have cross-sectional dimensions of 3.20 m × 1.00 m, with chamfered ends measuring 0.40 m × 0.375 m to improve hydraulic performance. Each pier is founded on a pile group comprising two 0.85 m diameter piles (four piles in total).
The main works included the construction of 12 piles at abutments E1 and E2 (with a total drilled length of 450 m) and 4 piles at piers P1 and P2 (with a total drilled length of 64 m); the construction of the reinforced concrete abutments, piers and deck structure; the installation of the track superstructure, including its connection to the existing railway line; and the installation of signaling systems.