New Railway Bridge at km 41+600 of the Ressano Garcia Line

  • Location: Mozambique
  • Solution: Bridges
  • Type: Railway bridges
  • Client: CFM – Portos e Caminhos de Ferro de Moçambique
  • Scope: Preliminary Design and Detailed Design of the New Bridge; Preliminary Design and Detailed Design of the Railway Diversion; Topographic Surveying; Geotechnical Investigation; Construction Supervision and Technical Assistance During Construction
  • Project: 2024
  • Construction: 2025-2026
  • Contractor: Teixeira e Duarte Lda
  • Dimension: 25m long

New Railway Bridge at km 41+600 of the Ressano Garcia Line

  • Location: Mozambique
  • Solution: Bridges
  • Type: Railway bridges
  • Client: CFM – Portos e Caminhos de Ferro de Moçambique
  • Scope: Preliminary Design and Detailed Design of the New Bridge; Preliminary Design and Detailed Design of the Railway Diversion; Topographic Surveying; Geotechnical Investigation; Construction Supervision and Technical Assistance During Construction
  • Project: 2024
  • Construction: 2025-2026
  • Contractor: Teixeira e Duarte Lda
  • Dimension: 25m long

The new bridge accommodates a ballasted double-track railway and features a continuous deck with a total length of 25 m (reinforced concrete), comprising two clear spans of 11.5 m each (23 m in total).

The bridge deck consists of two independent continuous reinforced concrete slabs, each with a variable thickness ranging from 0.70 m to 0.90 m and a width of 5.20 m (5.40 m including parapets and cornices), resulting in an overall bridge width of 11.40 m.

At the central support axis, the deck is supported by two piers (one for each deck slab). The piers have cross-sectional dimensions of 3.20 m × 1.00 m, with chamfered ends measuring 0.40 m × 0.375 m to improve hydraulic performance. Each pier is founded on a pile group comprising two 0.85 m diameter piles (four piles in total).

The main works included the construction of 12 piles at abutments E1 and E2 (with a total drilled length of 450 m) and 4 piles at piers P1 and P2 (with a total drilled length of 64 m); the construction of the reinforced concrete abutments, piers and deck structure; the installation of the track superstructure, including its connection to the existing railway line; and the installation of signaling systems.

Other projects

Marão Tunnel Concession

Marão Tunnel Concession

See more
New Railway Bridge over Shire River

New Railway Bridge over Shire River

See more
Bridge over Licungo River in N324 road

Bridge over Licungo River in N324 road

See more
Covilhã Public Garden Lift

Covilhã Public Garden Lift

See more
Replacement of the Bridge at pk50+200 of the Ressano Garcia Line

Replacement of the Bridge at pk50+200 of the Ressano Garcia Line

See more
Express motorway Maputo/ KaTembe/ Ponta do Ouro

Express motorway Maputo/ KaTembe/ Ponta do Ouro

See more
Top

We use cookies to improve your browsing experience. By continuing to access this website you are agreeing to their use. For more information see our cookie policy.

Portugal 2020 / Compete 2020 / União Europeia - Fundo Europeu do Desenvolvimento Regional