Marão Tunnel Concession

  • Location: IP4 – Amarante / Vila Real / Portugal
  • Solution: Bridges, Geotechnics
  • Type: Road bridges, Testing, prospection and studies, Geotechnical projects
  • Promoter: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Client: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Scope: Structural Design, Geometry Control Design, Geotechnical survey plan, Drainage and Hydrological Studies
  • Project: 2009
  • Construction: 2014
  • Contractor: INFRATÚNEL – Construtores do Túnel do Marão, ACE
  • Dimension: More than 1800m of road viaducts. Maximum span of 85m.
  • See on Google Maps

Marão Tunnel Concession

  • Location: IP4 – Amarante / Vila Real / Portugal
  • Solution: Bridges, Geotechnics
  • Type: Road bridges, Testing, prospection and studies, Geotechnical projects
  • Promoter: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Client: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Scope: Structural Design, Geometry Control Design, Geotechnical survey plan, Drainage and Hydrological Studies
  • Project: 2009
  • Construction: 2014
  • Contractor: INFRATÚNEL – Construtores do Túnel do Marão, ACE
  • Dimension: More than 1800m of road viaducts. Maximum span of 85m.
  • Ver no Google Maps

The Transmontana Highway or Trás-os-Montes and Alto Douro Highway (A4) is a Portuguese highway that links Porto (Matosinhos) to Bragança (on the Quintanilha border). It is an integral part of the IP4 and the European Road E82. It is currently the most important connection to the interior north of the Douro River, connecting the metropolitan area of Porto to the region of Trás-os-Montes and the border of Quintanilha, over an extension of 223 km.

The project included all the studies and designs necessary for the construction of seven Viaducts and fifteen Over and Under Passages.

With the exception of viaducts V4 and V5, all the remaining viaducts have a two beams prestressed concrete deck slab constructed using falsework. For viaducts V4 and V5, the bridge cross section is a box girder, constructed using a balanced cantilever system.

Other projects

New Railway Bridge over Shire River

New Railway Bridge over Shire River

See more
Replacement of the Bridge at pk74+100 of the Ressano Garcia Line

Replacement of the Bridge at pk74+100 of the Ressano Garcia Line

See more
Road interchange with multilevel lanes at Area 18, Lilongwe

Road interchange with multilevel lanes at Area 18, Lilongwe

See more
Rehabilitation and strengthening of 16 bridges along Limbe and Nkaya Corridor, in Malawi

Rehabilitation and strengthening of 16 bridges along Limbe and Nkaya Corridor, in Malawi

See more
Save river’s bridges

Save river’s bridges

See more
Cadal Channal’s Bridge in Soyo, Angola

Cadal Channal’s Bridge in Soyo, Angola

See more
Top

We use cookies to improve your browsing experience. By continuing to access this website you are agreeing to their use. For more information see our cookie policy.

Portugal 2020 / Compete 2020 / União Europeia - Fundo Europeu do Desenvolvimento Regional