New Railway Bridge over Shire River

  • Location: Balaka district, Malawi
  • Solution: Bridges, Infrastructure and Transport
  • Type: Railway bridges, Management and construction inspection, Roadways and railways, Management and construction inspection
  • Promoter: Central East African Railways - CEAR
  • Client: Central East African Railways - CEAR
  • Scope: Structural and railway track design, Inspection of exsiting structures, Studies of Geotechnics, Drainage, Flood Protection and Hydrology, onsite supervision of works of rail track and strucutres
  • Area: 1 031m2 de tabuleiro
  • Project: 2017/2018
  • Construction: 2018/2021
  • Photography: Mota-Engil Africa
  • Contractor: Mota-Engil Africa
  • Dimension: 165m long, 65m max span
  • See on Google Maps

New Railway Bridge over Shire River

  • Location: Balaka district, Malawi
  • Solution: Bridges, Infrastructure and Transport
  • Type: Railway bridges, Management and construction inspection, Roadways and railways, Management and construction inspection
  • Promoter: Central East African Railways - CEAR
  • Client: Central East African Railways - CEAR
  • Scope: Structural and railway track design, Inspection of exsiting structures, Studies of Geotechnics, Drainage, Flood Protection and Hydrology, onsite supervision of works of rail track and strucutres
  • Area: 1 031m2 de tabuleiro
  • Project: 2017/2018
  • Construction: 2018/2021
  • Photography: Mota-Engil Africa
  • Contractor: Mota-Engil Africa
  • Dimension: 165m long, 65m max span
  • Ver no Google Maps

The new railway bridge over Shire River is located on the Limbe/Mchinji railway line that establishes the link between Limbe and the West border with Zambia.

The existing bridge was a 3D frame truss that due to buckling of the chords, collisions, foundations’ differential settlements and general corrosion lost its structural bearing capacity. The structural assessment results and overall rehabilitation costs sentenced that the old structure was unrecoverable.

Furthermore, the bridge condition couldn’t achieve the global objective of modernization of the railways up to 21 ton/axes trains.

The new crossing with 165m long is divided in to 3 spans of 50m + 65m + 50m.

The deck is a composite steel-concrete solution with two girders that was constructed by the incremental launching method from the Northern bank. The precast slab panels were connected by studs and in situ concreting to the steel girders.

The project also included the design of 1000m of railways linking the new bridge to the existing line and the redesign of the Shire North Station’s quay where the railway line turns to double before entering the rail station.

Other projects

Replacement of the Bridge at pk74+100 of the Ressano Garcia Line

Replacement of the Bridge at pk74+100 of the Ressano Garcia Line

See more
Bridge B35 over Rivi Rivi river, Malawi

Bridge B35 over Rivi Rivi river, Malawi

See more
Rehabilitation and Conversion of the Portela Bridge over the Mondego River

Rehabilitation and Conversion of the Portela Bridge over the Mondego River

See more
Caldo river’s Bridge over Caniçada artificial lake

Caldo river’s Bridge over Caniçada artificial lake

See more
Marão Tunnel Concession

Marão Tunnel Concession

See more
Nossa Senhora da Guia Bridge in Ponte de Lima

Nossa Senhora da Guia Bridge in Ponte de Lima

See more
Top

We use cookies to improve your browsing experience. By continuing to access this website you are agreeing to their use. For more information see our cookie policy.

Portugal 2020 / Compete 2020 / União Europeia - Fundo Europeu do Desenvolvimento Regional