Rehabilitation of Dam Bridge over Mondego River

  • Location: Coimbra, Portugal
  • Solution: Bridges, Asset Management
  • Type: Road bridges, Rehabilitation
  • Promoter: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Client: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Scope: Reinforcement and Rehabilitation Design, Inspection, Safety Assessment, Geometric Surveying, Anomaly Mapping, Materials Testing and Geotechnical Study
  • Area: 34 000 m2 deck surface
  • Project: 2009/ 2010
  • Construction: 2011/ 2012
  • Contractor: OBRECOL – Obras e Construção S.A.
  • Dimension: 3km long
  • See on Google Maps

Rehabilitation of Dam Bridge over Mondego River

  • Location: Coimbra, Portugal
  • Solution: Bridges, Asset Management
  • Type: Road bridges, Rehabilitation
  • Promoter: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Client: Infraestruturas de Portugal SA (ex Estradas de Portugal, EPE)
  • Scope: Reinforcement and Rehabilitation Design, Inspection, Safety Assessment, Geometric Surveying, Anomaly Mapping, Materials Testing and Geotechnical Study
  • Area: 34 000 m2 deck surface
  • Project: 2009/ 2010
  • Construction: 2011/ 2012
  • Contractor: OBRECOL – Obras e Construção S.A.
  • Dimension: 3km long
  • Ver no Google Maps

The Dam Bridge in Coimbra town is located on the Mondego river bed and connects the areas of Bencanta to the beginning of Choupal area.
As part of the Mondego hydric project, where the Aguieira hydroelectric dam was included, this dam was design in 1978 and allowed the creation of a permanent water mirror in front of the city's downtown.

Inaugurated in 1981, this complex structure also included a bridge, built over the dam, and its access viaducts.
In the beginning of the 1990s, the right bank viaduct went through extension works along Fernão de Magalhães Avenue and an access viaduct to Santa Clara.

The infrastructure has a total extension of about 3km.

The deck structural solution is a pre-stressed reinforced concrete slab directly supported on circular piers. The piers top extremity widens forming a paraboloid that supports the slab.

Considering the conservation state of the structure, Estradas de Portugal launched a tender for a rehabilitation and reinforcement project, including the structural assessment accordingly with the updated legislation.

In the study phase, Betar performed several complementary activities and studies in order to support the design project, namely: Inspection, Foundations Inspection, Geological-Geotechnical investigations, dimensional survey, deck leveling survey, materials testing and detailed inspection including defect mapping.

Due to the importance of this bridge within the city's roadway system there was a need to implement a complex road bypass project, executed in several phases during construction.

The main activities were the strengthening or full replacement of piers, the Bencanta abutment foundation strengthening with jet-grouting columns, and the introduction of backstop elements on the branches abutment viaducts for seismic strengthening.

Other projects

Kassuende Bridge in Tete over the Zambezi River

Kassuende Bridge in Tete over the Zambezi River

See more
Replacement of the Bridge at pk74+100 of the Ressano Garcia Line

Replacement of the Bridge at pk74+100 of the Ressano Garcia Line

See more
Bridge over Licungo River in N324 road

Bridge over Licungo River in N324 road

See more
Highway Litoral Oeste Sub-Concession

Highway Litoral Oeste Sub-Concession

See more
Penacova’s Bridge over the Mondego River

Penacova’s Bridge over the Mondego River

See more
Rehabilitation of the Cable-Stayed Bridge on the Arade River

Rehabilitation of the Cable-Stayed Bridge on the Arade River

See more
Top

We use cookies to improve your browsing experience. By continuing to access this website you are agreeing to their use. For more information see our cookie policy.

Portugal 2020 / Compete 2020 / União Europeia - Fundo Europeu do Desenvolvimento Regional