Cunha Rivara Middle and High School

  • Location: Arraiolos, Portugal
  • Solution: Buildings
  • Type: Education
  • Promoter: Parque Escolar
  • Architecture: BB Arquitectos
  • Scope: Foundations and structures, sewerage and water supply
  • Area: 10500m2
  • Project: 2010
  • Construction: 2012
  • Photography: Paulo Lamy / Vicente Roque
  • Contractor: Opway Engenharia
  • See on Google Maps

Cunha Rivara Middle and High School

  • Location: Arraiolos, Portugal
  • Solution: Buildings
  • Type: Education
  • Promoter: Parque Escolar
  • Architecture: BB Arquitectos
  • Scope: Foundations and structures, sewerage and water supply
  • Area: 10500m2
  • Project: 2010
  • Construction: 2012
  • Photography: Paulo Lamy / Vicente Roque
  • Contractor: Opway Engenharia
  • Ver no Google Maps

The Cunha Rivara Middle and High School consist of a new building, replacing the existing ones, incorporating three main structural bodies, plus two smaller structural bodies that house technical areas, all with frame-type structures in reinforced concrete or pre-stressed reinforced concrete.

In body A we find the entrance to the school, the administrative services, the new opportunities center, the multipurpose room, the photography club, the music room, the theater workshop, sanitary facilities and technical areas, all on the ground floor. On the upper floor we find classrooms, art rooms, teaching areas, library, multipurpose room, sanitary facilities and technical areas.In the central area are located the accesses between floors composed of two ramps that develop longitudinally along approximately 36.0m.

Body B constitutes the central and distribution body of the building. It consists of a ground floor, which consists of the covered space for students, and a raised floor where, along the northern and southern periphery, two wings of classrooms are developed in parallel. It has a circular opening with 38.50m diameter in the 1st floor, which is repeated, slightly off-center, at the roof slab. Similarly to body A, the access between floors is achieved through a helical ramp that follows the circular geometry of the opening.

Body C is intended for science and technology rooms, first aid station, sanitary facilities and technical areas at the -1 floor level, for social spaces, sanitary facilities and technical areas, at the ground floor level and, at the 1st floor, art rooms and classrooms are intended. Access between the different floors is achieved through two cores of stairs adjacent to the gable with body B and by an elevator core.

Other projects

Olivais shopping centre

Olivais shopping centre

See more
Quinta dos Murças Winery

Quinta dos Murças Winery

See more
Horta da Porta

Horta da Porta

See more
Machado de Castro National museum

Machado de Castro National museum

See more
Fontana Park Hotel

Fontana Park Hotel

See more
Ordem dos Engenheiros’ headquarters expansion

Ordem dos Engenheiros’ headquarters expansion

See more
Top

We use cookies to improve your browsing experience. By continuing to access this website you are agreeing to their use. For more information see our cookie policy.

Portugal 2020 / Compete 2020 / União Europeia - Fundo Europeu do Desenvolvimento Regional