Nova Medical School – Research centre and Library

  • Location: Lisbon, Portugal
  • Solution: Buildings
  • Type: Rehabilitation, Education, Healthcare, Industry and technology
  • Architecture: ZT Arquitectos / Gonçalo Byrne Arquitectos
  • Client: Nova University of Lisbon
  • Scope: Foundations and structure
  • Area: 9691m2
  • Project: 2005-2010
  • Construction: 2012
  • Photography: Alberto Severino / Pedro Leitão
  • See on Google Maps

Nova Medical School – Research centre and Library

  • Location: Lisbon, Portugal
  • Solution: Buildings
  • Type: Rehabilitation, Education, Healthcare, Industry and technology
  • Architecture: ZT Arquitectos / Gonçalo Byrne Arquitectos
  • Client: Nova University of Lisbon
  • Scope: Foundations and structure
  • Area: 9691m2
  • Project: 2005-2010
  • Construction: 2012
  • Photography: Alberto Severino / Pedro Leitão
  • Ver no Google Maps

The intervention, at the former Câmara Pestana Institute, focused on the buildings of Microbiology, Immunology, Genetics and Library, aiming at the installation of a set of reference services of the Faculty, namely the CEDOC (center for the investigation of chronic diseases) and the library.

In the library building, the intervention consisted in the demolition of the interior, maintenance of the existing facades, the execution of three floors and a semi-buried floor, by slightly lowering the floor -1, and expanding the building to the west. On the elevated levels, the building is structured by peripheral reinforced concrete walls, adjacent to the existing facade walls, and by a new alignment of columns. The roof structure, whose exterior shape has been preserved, consists of metal beams.

The Genetics building, with three floors above ground, a ground floor and a buried floor, is an extension of the block to the north of the library, with the interior floors having been remodelled and creating a new elevated volume to the west. The detachment of this volume is highlighted by the lowering of the level of the interior patio, whose floor slab constitutes the cover of a parking basement that is shared with the Immunology building. Both the flat slab and the lateral cantilevers are post-tensioned by incorporating non-adherent steel strands.

The Immunology building is a structure built from scratch and not conditioned by other existing buildings, with the exception of an old cistern.

Other projects

Henriques Nogueira Secondary School

Henriques Nogueira Secondary School

See more
Fontana Park Hotel

Fontana Park Hotel

See more
Altis Avenida Hotel

Altis Avenida Hotel

See more
LEYA Editorial Group Headquarters Building

LEYA Editorial Group Headquarters Building

See more
Praia do Canal Nature Resort

Praia do Canal Nature Resort

See more
Jardins São Bartolomeu Apartment Complex

Jardins São Bartolomeu Apartment Complex

See more
Top

We use cookies to improve your browsing experience. By continuing to access this website you are agreeing to their use. For more information see our cookie policy.

Portugal 2020 / Compete 2020 / União Europeia - Fundo Europeu do Desenvolvimento Regional