Sky Business

  • Location: Luanda, Angola
  • Solution: Buildings
  • Type: Offices
  • Promoter: ESCOM
  • Architecture: RISCO - Projectistas e Consultores de Design
  • Scope: Structures
  • Area: 33150m2
  • Project: 2009-2011
  • Construction: 2010-2013
  • Photography: FG+SG | Fotografia de Arquitectura / Teixeira Duarte
  • Contractor: Teixeira Duarte
  • See on Google Maps

Sky Business

  • Location: Luanda, Angola
  • Solution: Buildings
  • Type: Offices
  • Promoter: ESCOM
  • Architecture: RISCO - Projectistas e Consultores de Design
  • Scope: Structures
  • Area: 33150m2
  • Project: 2009-2011
  • Construction: 2010-2013
  • Photography: FG+SG | Fotografia de Arquitectura / Teixeira Duarte
  • Contractor: Teixeira Duarte
  • Ver no Google Maps

Mixed-use building, within the Sky Center real estate complex of the ESCOM Group, with 23 floors above ground, with 3 floors for commerce, 20 floors for offices, and a technical floor, and 8 underground floors for technical areas (water reservoirs on floors -8, -3 and -2) and parking, separated from the SKY Residence II through an expansion joint.

The Sky Business ground floor holds the main entrance, not only for the office floors, but also for the shopping center that extends through the two buildings on the 1st floor. This entrance is characterized by a large space with a three-story high ceiling.

The building consists of a reinforced concrete frame structure, up to the 3rd floor, although the crossbeams consist of flat slabs.

The vertical structures consist of a set of columns arranged around the reinforced concrete walls that shape the elevators and stairs core, and serve the entire building. All the vertical elements in reinforced concrete that start on the basement end at floor level 3, whose floor is a transition slab in pre-stressed reinforced concrete, and whose thickness varies between 0.40 and 1.60m.

On the remaining elevated floors, up to the roof, the mixed steel-concrete floor structures are supported on the core walls and on a series of vertical steel RHS columns, arranged along the perimeter of the floors, and defining the building's facade.

Other projects

House in Largo Santa Cruz do Castelo

House in Largo Santa Cruz do Castelo

See more
Mundial Hotel Extension

Mundial Hotel Extension

See more
Montijo Retail Park – Load bearing increase

Montijo Retail Park – Load bearing increase

See more
Restauradores 72

Restauradores 72

See more
Portuguese Design Centre (Germano de Sousa Laboratory)

Portuguese Design Centre (Germano de Sousa Laboratory)

See more
JFS Corporate Tower

JFS Corporate Tower

See more
Top

We use cookies to improve your browsing experience. By continuing to access this website you are agreeing to their use. For more information see our cookie policy.

Portugal 2020 / Compete 2020 / União Europeia - Fundo Europeu do Desenvolvimento Regional