Montijo Retail Park – Load bearing increase

  • Location: Montijo, Portugal
  • Solution: Buildings
  • Type: Rehabilitation, Retail
  • Promoter: Leroy Merlin
  • Client: Montijo Retail Park
  • Scope: Foundations and structure
  • Project: 2018
  • Construction: 2019
  • Photography: Teixeira Duarte
  • Contractor: Teixeira Duarte
  • See on Google Maps

Montijo Retail Park – Load bearing increase

  • Location: Montijo, Portugal
  • Solution: Buildings
  • Type: Rehabilitation, Retail
  • Promoter: Leroy Merlin
  • Client: Montijo Retail Park
  • Scope: Foundations and structure
  • Project: 2018
  • Construction: 2019
  • Photography: Teixeira Duarte
  • Contractor: Teixeira Duarte
  • Ver no Google Maps

The structural intervention in store #1 of Montijo Retail Park aimed to endow the space with the ability to withstand live loads greater than those defined in the original project, enabling the installation of a Leroy Merlin store for construction materials. In particular, the reinforcement made it possible to triple the live load, from 10 kN/m2 to 30 kN/m2 (about 3 tons / m2).

After analyzing the original project, as well as the geotechnical report, the necessary interventions were defined, which essentially involved the casing of the concrete columns with an increase of 0.20m in thickness on each face; the introduction of an upper compression concrete layer over the existing slab, applied after the removal of the existing screed, and properly connected to the slab, allowing for a new upper reinforcement; the introduction of reinforcement for punching with threaded rods and plates; the introduction of reinforcement steel plates for bending, on the underside of the ribs, according to the spans; and introduction of minor reinforcements in other structural elements.

A relevant point was related to the adequate amount of stirrups of the existing ribs, in general, which made it possible to accommodate the addition of live loads withou new shear reinforcement of the ribs, which would be complex and expensive to perform.

This solution did not imply the reinforcement of the existing foundations (which had adequate load capacity), nor did it change the metric of columns at the basement level, which, in addition to reducing the number of customer parking spaces, would affect the movement of vehicles. and would have a very relevant visual impact.

Other projects

Extension of Lisbon School of Economics and Management (ISEG)

Extension of Lisbon School of Economics and Management (ISEG)

See more
Lake Garden

Lake Garden

See more
Lisbon University’s Faculty of Sciences – C6 Building

Lisbon University’s Faculty of Sciences – C6 Building

See more
São João da Mata 17

São João da Mata 17

See more
Dive In – KØS Museum of Art in Public Spaces, Denmark

Dive In – KØS Museum of Art in Public Spaces, Denmark

See more
Restauradores 72

Restauradores 72

See more
Top

We use cookies to improve your browsing experience. By continuing to access this website you are agreeing to their use. For more information see our cookie policy.

Portugal 2020 / Compete 2020 / União Europeia - Fundo Europeu do Desenvolvimento Regional