GOA – 25 de Abril Bridge

GOA – 25 de Abril Bridge

Betar's monitoring of the 25 de Abril Bridge included a detailed inspection to detect and identify anomalies in the submerged surfaces of the piers.

To this end, an underwater, visual and tactile inspection was carried out, documented with photography and video.

Betar carried out coordination, supervision, interpretation of results and intervention proposals, indicating the corrective measures to be implemented.

Other projects

Rehabilitation of Pedestrian Overpasses at Gare do Oriente

Rehabilitation of Pedestrian Overpasses at Gare do Oriente

See more
Belver Steel Bridge over the Tagus River

Belver Steel Bridge over the Tagus River

See more
GOA – Luiz I Bridge

GOA – Luiz I Bridge

See more
D.Ana Railway Bridge over the Zambezi River

D.Ana Railway Bridge over the Zambezi River

See more
Rehabilitation of the Cable-Stayed Bridge on the Arade River

Rehabilitation of the Cable-Stayed Bridge on the Arade River

See more
Rehabilitation and strengthening of 16 bridges along Limbe and Nkaya Corridor, in Malawi

Rehabilitation and strengthening of 16 bridges along Limbe and Nkaya Corridor, in Malawi

See more
Top

We use cookies to improve your browsing experience. By continuing to access this website you are agreeing to their use. For more information see our cookie policy.

Portugal 2020 / Compete 2020 / União Europeia - Fundo Europeu do Desenvolvimento Regional