Highway Litoral Oeste Sub-Concession

  • Location: Leiria District, Portugal
  • Solution: Bridges, Geotechnics
  • Type: Road bridges, Testing, prospection and studies
  • Promoter: AELO (BRISA highways)
  • Client: LOC Litoral Oeste Construtores, ACE
  • Scope: Structural Design, Geotechnical, Hydraulic and Drainage Studies
  • Project: 2008/2011
  • Construction: 2011/2013
  • Photography: LOC Litoral Oeste Construtores, ACE
  • Contractor: LOC Litoral Oeste Construtores, ACE
  • Dimension: Lis river viaduct: 814m long, 39.50m max span
  • See on Google Maps

Highway Litoral Oeste Sub-Concession

  • Location: Leiria District, Portugal
  • Solution: Bridges, Geotechnics
  • Type: Road bridges, Testing, prospection and studies
  • Promoter: AELO (BRISA highways)
  • Client: LOC Litoral Oeste Construtores, ACE
  • Scope: Structural Design, Geotechnical, Hydraulic and Drainage Studies
  • Project: 2008/2011
  • Construction: 2011/2013
  • Photography: LOC Litoral Oeste Construtores, ACE
  • Contractor: LOC Litoral Oeste Construtores, ACE
  • Dimension: Lis river viaduct: 814m long, 39.50m max span
  • Ver no Google Maps

The highway Litoral Oeste Sub-Concession is located in the center of Portugal and covers 102km of road network linking the A1, 17 and A8 highways. It establishes itself as a touristic route with access to Batalha Monastery, Cristo’s Convent in Tomar, Nazaré’s beach and Fátima Sanctuary, among others.

BETAR has performed the detailed design of 13 viaducts, including different typologies of post-tensioned concrete structures, construction methods, extensions and spans.

The structural highlights are the Viaduct over Lis River, which is 814m long and has a 39.50m maximum span and was constructed with pre-cast and post-tensioned concrete “I” section beams, and the Viaduct over Lena River, which is 218m long with a 33m maximum span and was constructed with pre-cast and pre-tensioned concrete “U” section beams.

The pre-cast elements – such as beams, pier caps and pre-slabs - were placed with elevation equipment and, later on, the slab was concreted in situ. The pier's geometry varies from solid to voided cross sections and stand over footings or pile foundations.

In general, each viaduct is geminate. Each platform allows for 2 traffic lanes of 3.50m in each direction and large shoulders, which may be used in the future. There are technical sidewalks in the external side of the platforms. The longitudinal separator is of GBA type.

Other projects

Bridge over Licungo River in N324 road

Bridge over Licungo River in N324 road

See more
New Railway Bridge over Shire River

New Railway Bridge over Shire River

See more
Pedestrian Bridge over Sizandro River in Torres Vedras

Pedestrian Bridge over Sizandro River in Torres Vedras

See more
Replacement of the Matola River Bridge at pk26+900 of the Ressano Garcia Line

Replacement of the Matola River Bridge at pk26+900 of the Ressano Garcia Line

See more
Road interchange with multilevel lanes at Area 18, Lilongwe

Road interchange with multilevel lanes at Area 18, Lilongwe

See more
Rehabilitation and Conversion of the Portela Bridge over the Mondego River

Rehabilitation and Conversion of the Portela Bridge over the Mondego River

See more
Top

We use cookies to improve your browsing experience. By continuing to access this website you are agreeing to their use. For more information see our cookie policy.

Portugal 2020 / Compete 2020 / União Europeia - Fundo Europeu do Desenvolvimento Regional